Transportation

EVALUATION, DESIGN, AND CONSTRUCTION

HARRIS STREET CTEP SIDEWALKS

BIG TIMBER, MT

Project Features

  • 700 feet of concrete sidewalk
  • Curb and gutter
  • Connects grade school to 4th Street
  • Safety improvements
  • Drainage improvements
  • ADA compliant design
  • Project Cost $97,000

Project Grants

  • 73% of the project was funded through grants.
  • $71,000 CTEP

Project Activities

  • Survey
  • Conceptual Design
  • Recommendations
  • Design
  • Coordination with MDT
  • Bidding Assistance
  • Field Inspections
  • Construction Management

Project Photos