Riverside Park Bank Stabilization

City of Laurel, Montana

Project Features

  • Rebuilding and stabilizing 715 linear feet of eroded bank
  • 7,500 cubic yards of riprap and riparian vegetation
  • Removal of 5,500 cubic yards of channel deposition to restore capacity to adjacent bridges
  • Rebuilt flood dike along bank to protect Riverside Park
  • Project required Army Corps of Engineers 404b Individual Permit and NEPA compliance
  • CLOMR Obtained from FEMA before contstruction
  • LOMR Completed after construction
  • Project cost $1,449,601

Project Grants

  • FEMA 75%
  • State of Montana 25%

Project Activities

  • Conceptual Design
  • Floodplain Analysis
  • Hydraulic modeling
  • MEPA/NEPA Compliance
  • Preliminary Engineering Report
  • Permitting
  • Topographical Survey