Gallatin County, Montana
On-call Solid Waste EngineerWhen Great West was hired in 2005 the Gallatin County Solid Waste District faced major challenges. The incoming tonnage nearly quadrupled from 30,000 tons/year to 115,000 tons/year. The existing scale facility and Master Plan for the construction of a 1.5 acre cell were inadequate for the major increase in tonnage. Great West assisted the District in the fast-track construction of a new scale/scale house facility, preparation of a new Master Plan and design of the Phase 3 cell. Over a 1.5 year period the District completed excavation of nearly 600,000 cubic years of material and constructed the lined cell. Great West has served as the on-call engineer for the District since 2005, completing numerous projects.
Project Highlights
- Scale and scale house improvements (2006)
- Phase 3 expansion cell (2007)
- Alternative cover demonstration (2010)
- Leachate pond upgrade (2011)
- Phase 2 closure (2012)
- Operations and Maintenance Manual
- Streambank stabilization project (2014)
- Equipment wash bay (2014)
- License expansion for composting (2015)
- Phase 4 cell design and construction (2019)
- Landfill drop-off facility study (2019)
- Regional transfer station study (2019)
- Upgrade scale/entrance facilities (2020)
- Performance and capacity evaluations (on-going)
- Corrective measures (on-going)
- Groundwater and gas monitoring (on-going)
- License expansion (on-going)