Project Features
- 9 acre composite liner landfill
- Double lined leachate collection pond
- Access road for future landfill expansions
- 6 inch compacted native clay layer
- 60 mil double sided textured HDPE flexible membrane liner
- Non-woven geotextile fabric
- Gravel base drainage and protective layer
- Project cost Phase 3 $1.4 million
- 8 acre lined cell
- 6 inch compacted native clay layer
- 60 mil double sided textured HDPE liner
- Project cost Phase 4 $750,000
- 14 Acre lined cell
- 6” compacted native clay layer
- Non-woven geotextile fabric
- 60 mil double sided textured HDPE liner
- Leachate Collection System
- Project cost Phase 5 $2.1 million
Project Activities
- Geotechnical Evaluation
- Permitting
- Alternative Liner Design
- Design
- Field Inspections
- Construction Management
- Bidding