Solid Waste

Landfill Phase 3, Phase 4, and Phase 5 Expansion Projects

Phase 3, Phase 4, and Phase 5 Expansion

City of Billings, MT

Project Features

  • 9 acre composite liner landfill
  • Double lined leachate collection pond
  • Access road for future landfill expansions
  • 6 inch compacted native clay layer
  • 60 mil double sided textured HDPE flexible membrane liner
  • Non-woven geotextile fabric
  • Gravel base drainage and protective layer
  • Project cost Phase 3 $1.4 million
  • 8 acre lined cell
  • 6 inch compacted native clay layer
  • 60 mil double sided textured HDPE liner
  • Project cost Phase 4 $750,000
  • 14 Acre lined cell
  • 6” compacted native clay layer
  • Non-woven geotextile fabric
  • 60 mil double sided textured HDPE liner
  • Leachate Collection System
  • Project cost Phase 5 $2.1 million

Project Activities

  • Geotechnical Evaluation
  • Permitting
  • Alternative Liner Design
  • Design
  • Field Inspections
  • Construction Management
  • Bidding