Water

EVALUATION, DESIGN, AND CONSTRUCTION

WATER MAIN, STORAGE, and FIRE HYDRANTS

CASCADE, MT

Planning

  • 1995 Water Supply Analysis and Reportrs
  • 1999 Water Supply Analysis and Report
  • 1999 PER Update
  • 2004 CIP
  • 2004 PER
  • 2004 Grant Applications
  • 2008 PER Update
  • 2008 Loan Application
  • 2012 PER
  • 2012 Grant Applications

Phase 1

  • 273,000 gallon welded steel reservoir with telemetry interior and exterior epoxy coating systems
  • 2,700 lf of 12-inch transmission main
  • 12-inch transmission main trenchless interstate crossing
  • 20 fire hydrant replacements
  • Project cost $1.3 million>

Phase 2

  • 8,200 feet of 6-inch to 12-inch water main
  • 6 fire hydrants
  • Project cost $1.3 million

Phase 3

  • 12,000 lf of 6-inch to 8-inch water main
  • Fire hydrant and valve replacement
  • 147 service reconnections
  • Estimated project cost $2.1 million