Project Features
- Rebuilding and stabilizing 715 linear feet of eroded bank
- 7,500 cubic yards of riprap and riparian vegetation
- Removal of 5,500 cubic yards of channel deposition to restore capacity to adjacent bridges
- Rebuilt flood dike along bank to protect Riverside Park
- Project required Army Corps of Engineers 404b Individual Permit and NEPA compliance
- CLOMR Obtained from FEMA before contstruction
- LOMR Completed after construction
- Project cost $1,449,601

Project Grants
- FEMA 75%
- State of Montana 25%

Project Activities
- Conceptual Design
- Floodplain Analysis
- Hydraulic modeling
- MEPA/NEPA Compliance
- Preliminary Engineering Report
- Permitting
- Topographical Survey