Wastewater

Wastewater Disinfection, Sewer Main I&I Reduction

Wastewater Disinfection and Sewer Main I&I Reduction

City of Hardin, MT

Project Features

  • I&I study
  • 30,000 lf of new pipe, pipe rehabilitation, and pipe replacement
  • Pipe rehabilitation by Cast In Place Pipelining (CIPP)
  • Ultraviolet (UV) disinfection of wastewater discharge
  • Project cost $3.1 million

Project Grants

  • 38% of the project was funded through grants.
  • $500,000 TSEP
  • $100,000 DNRC
  • $390,700 ARRA Grant
  • $200,000 Montana Coal Board Grant
  • The remainder of the project was funded by an ARRA loan of $359,300, an SRF loan of $625,000,$750,000 by the City, $100,000 by the County, and $100,000 from an SID.

Project Activities

  • Preliminary Engineering Report (PER)
  • Design
  • Construction Management
  • Grant Administration
  • Inventory and Prioritization of all sewer main
  • TV Inspection of sewer mains
  • Capital Improvements Planning (CIP)