Wastewater

EVALUATION, DESIGN, AND CONSTRUCTION

Wastewater System Improvements

Harlem, MT

Project Features

  • Lift Stations
  • Force mains
  • Blower Building / Building Rehabilitation
  • New Blowers and aeration main
  • Aerated Primary lagoon (LLDPE lined) with baffle curtain
  • Storage Lagoon (LLDPE lined) for Irrigation
  • Lagoons constructed on difficult soils
  • Irrigation pivot with Effluent and River Water Irrigation
  • Flood Irrigation earthwork
  • Gravity sewer
  • Sludge Removal (Bio Bags) and land application disposal

Project Grants

  • $625,000 TSEP
  • $3,096,000 RD Grant
  • $1,205,000 RD Loan

Project Activities

  • Bidding Assistance
  • Computation
  • Conceptual Design
  • Construction Management
  • Data/Environmental Collection
  • Design
  • Field Inspections
  • Flood Plain Analysis for Lagoons
  • Groundwater Study
  • Land Acquisition
  • PER
  • Permitting
  • Planning
  • Public Meetings
  • Rate Analysis
  • Recommendations
  • Report Preparation
  • Survey
  • Administrative Order (AOC)
  • Discharge Permit Violations
  • Sludge Land Application analysis and review

Project Photos